Guangzhou College of Technology and Business (Huadu)
Intelligent Swimming Pool Water Treatment Solution for University Aquatic Facility
Project Case Study by Qiaoyi Water Treatment Technology
|
Project Name |
Guangzhou College of Technology and Business Huadu Campus Swimming Pool |
|
Project Type |
University Campus Swimming Pool |
|
Application |
University Swimming Pool / Training Pool |
|
Main Systems |
Filtration System, Disinfection System, Circulation System, Water Quality Monitoring System |

Design Framework
Guangzhou College of Technology and Business Huadu Campus Swimming Pool is a campus aquatic facility designed to support university physical education, swimming training, and student recreational activities.
As an educational facility serving a large number of students, the swimming pool requires a reliable water treatment system to ensure Safe swimming conditions
|
|
|
Stable Water Quality
University swimming pools are used frequently.
01
Improved Filtration Efficiency
Public swimming pools require powerful filtration capabilities to maintain clear water.
02
Reduced Daily Operating and Maintenance Costs
Schools need reliable and easy-to-manage systems.
03
Smart Water Resource Management
Modern public facilities require digital management to improve operational efficiency.
04
Construction & Installation Process
The school currently has two campuses, located in the heart of the Guangdong-Hong Kong-Macao Greater Bay Area, boasting a superior geographical location and comprehensive teaching facilities. The campuses cover an area of 926,714.42 square meters and feature a standard track and field stadium, a large gymnasium, various sports fields, a student activity center, and other cultural and sports facilities.
Strictly follow the design drawings and technical specifications.
Rapid Response: At 7:42 AM, upon receiving an urgent construction requirement from the client, requiring the installation of the bottom outlet pipe of the pool and ensuring accurate completion within a short time frame, Hygool immediately deployed a 8-person professional construction team to expedite the construction, strictly controlling precision and schedule throughout the process. The work originally planned to be completed in 3 days, was accomplished on the same day. Saving valuable time for subsequent equipment installation and system commissioning. This fully demonstrated the Hygool team's outstanding organizational and coordination capabilities and rich construction experience.



Core Equipment & Technology
With piping, equipment positioning, and electrical wiring completed during construction, the installed system now delivers the intended performance. Below are the key products deployed and their specific roles.
Real-time monitoring of pH, ORP, NTU, and .FRC in water. Water quality is adjusted in real-time based on monitoring results.
Achieves highly efficient pool water disinfection. Hydroxyl radicals (•OH) can non-selectively and rapidly attack and decompose microorganisms and organic matter in water.
Project Results

|
Name |
Water area (m²) |
Water volume(m³) |
Circulation way |
Core equipment |
Cover system |
|
Infinity swimming pool |
866.2 |
1239 |
Counter flow |
Pool equipment: Multi-parameter water quality monitor, sodium hypochlorite generator, AOP Advanced oxidation disinfector, intelligent electrical control cabinet |
Circulation, Filtration, Disinfection |