What are the basic specifications for the swimming pool water treatment equipment room?

Leave a message

Common swimming pool equipment: swimming pool filtration system, swimming pool disinfection equipment, swimming pool monitoring equipment. No matter which swimming pool equipment you choose, you must arrange the location of the swimming pool equipment room and plan the size of the swimming pool equipment room. What are the requirements for the layout of the swimming pool equipment room?

 

Six key points of equipment room layout

 

1. Ground floor equipment room design: The ground floor equipment room should have an equipment transportation entrance directly leading to the outdoors to facilitate equipment entry and exit.

2. Underground or floor equipment room setting: If the equipment room is located in the basement or above the ground, a transportation channel and lifting holes must be set up, and the size and load-bearing capacity must meet the maximum equipment requirements.

 

info-400-299

3. Height and area of the machine room: The height and area of ​​the machine room must meet the requirements of equipment installation, construction and maintenance, and the location should be close to the swimming pool.

4. Civil engineering separation and load: The machine room should be clearly separated from other rooms, and the equipment on the floor should provide load information to the structural department.

5. Pipeline entrances and exits: The machine room should have entrances and exits leading to the circulating water pipeline to facilitate pipeline connection.

6. Fire protection design: The fire resistance level and fire protection design of the machine room must comply with the current national standards.

 

Swimming pool equipment room installation requirements

 

1. Ambient temperature: The room temperature is not less than 5℃, and the control room temperature is between 16℃ and 35℃.

2. Lighting and ventilation: The room needs to have good lighting, ventilation and ground drainage measures.

3. Vibration isolation and noise reduction: Vibration isolation and noise reduction measures need to be taken for rotating equipment and connecting pipes.

 

info-400-224

4. Building sound insulation: The machine room should be separated from other rooms and sound insulation measures should be taken.

5. Equipment foundation: Equipment, devices, containers and pipelines in the machine room should be set up with a foundation or support that is not less than 0.1m above the ground

 